Our Projects
Nessma Aldjadida Company
Completion rate | The project Location | Owner | project name | number |
100 % | Rayyaneh Municipality | New Orbit Company | Establishing 6 classrooms | 1 |
100 % | Nesma area | Nesma Rural Hospital | Create a warehouse (hanger) | 2 |
100 % | Tadjoura | General Electric Company | Maintenance of Al-Kawatib power station | 3 |
100 % | Gharyan | Electrical Construction Company | 11 kV overhead lines and underground cables implementation project | 4 |
100 % | Nessma Municipality | Al-Rafaq Educational Department | School maintenance | 5 |
100 % | Sebha | Sebha University
In cooperation with UNDP |
Classroom maintenance | 6 |
100 % | Tripoli seaport | Ports and Maritime Transport Authority | Maintenance of concrete roads and construction of a rainwater drainage network | 7 |
100 % | Janzour | Janzour Municipality | Quick maintenance for 3 schools | 8 |
100 % | Friday market | Souq Al-Juma Municipality | Quick maintenance for 3 schools | 9 |
100 % | Sabratha city | Sabratha Hospital
In cooperation with UNDP |
Maintenance of the ambulance and emergency department
Sabratha Hospital |
10 |
100 % | City of Sabha | Sabha Municipality
In cooperation with UNDP |
Establishing generator protection rooms for water pump wells | 11 |
100 % | Zuwara city | Zuwara Hospital
In cooperation with the International Medical Corps |
Maintenance project for the medicine store at Zuwara Hospital | 12 |
100 % | Ghadwa area | Sabha Municipality
|
Implementation of a water line linking the water well to the main line and supplying and installing an electric generator | 13 |
100 % | breeze | Nessma Municipality | Implementing a drinking water line from the well to the ground tank at the General Water Company | 14 |
100 % | Sorman | Sorman Municipality
In cooperation with GVC |
Maintenance of 2 schools and a health center | 15 |
Work is underway | Tripoli | Municipality of Tripoli Centre | Maintenance and development project of infrastructure and external walls in the (Casa Langs) neighborhood in Mahalla Al-Dahr | 16 |
Work is underway | Brega Marsa | Sirte Oil and Gas Production and Processing Company | Excavation, backfilling and laying of fiber optic cable project for Brega-Ras Lanuf gas pipeline | 17 |
100 % | Tripoli seaport | Al Mabrouk Oil Operations Company | Maintenance of Al-Mabrouk Oil Operations Company’s warehouse in the port of Tripoli | 18 |
Work is underway | Benghazi city | New Orbit Company | Preparing the network administration building in Benghazi | 19 |